Monorail Certification Load Test
Rozelle Interchange engaged Ranger Lifting supplied a custom made electric trolleys and hoists for the installation of the ventilation fans
Monorails load tested to 11t
Highest monorail was 23 meters high
Rozelle Interchange engaged Ranger Lifting supplied a custom made electric trolleys and hoists for the installation of the ventilation fans
Monorails load tested to 11t
Highest monorail was 23 meters high