Supply of lifting equipment and proof load of all Lifting Beams
System Connect Line Wide is the joint venture that was contracted to fit out the Sydney Metro 2 Tunnels.
Ranger worked with the engineers of Systems Connect to provide a solution that would accommodate the low headroom, which was a major concern for the project.